Cut Down Timescales

Increase or Decrease an Existing Supply

If you’re developing a site that has an existing gas or electricity supply which requires an increase or decrease to the infrastructure.

If you require to increase or you need to connect an additional load to an existing supply or just simply relocate an existing service position we are able to arrange these for you.

We require you to provide informationthat will inform us of any unusual or disruptive loads that you will be installing.  All applications must be accompanied by a location and site plan showing the nearest main streets / roads.

We guarantee that there are only 3 simple stages of any connections with Crown Energy:-

3 Simple Stages

  1. Application – Download an application form and complete. Once you’ve returned an experienced design engineer will check and then commence the design and quotation process.
  2. Design & Quotation – We will send you your quotation along with any site plans. Each quotation will show how long it is valid for.
  3. Acceptance – Once you’ve accepted and paid for the quotation we will then process your connection and commence the project, informing you at every stage.

Download Application Forms:

Contact Crown Energy Now On: 0845 053 5454

Contact Us
Contact Name *
Telephone *
Email Address *
Security text

Please type the below text exactly as shown
Captcha
* indicates required field
7 Reasons people choose Crown Energy