0330 123 2255
Crown Energy

3-Phase Electric Meter Installations

Crown Energy carry out 3-phase electric meter installations for a range of business customers across a range of sectors, including industrial, trade, commercial and many more.

Single-phase or 3-phase electricity supply

If you’re unsure which type of supply is right for your business, a quick call to our electricity meter experts should help get you up to speed with the differences and which will be most suitable for your requirements. In general terms, the difference relates to their safe load capacity and use cases.

3 phase electric meter

Single-phase electric supply

For a typical small business premises with a low electrical usage, a single-phase installation will most likely be all that is required as it’s unlikely that you’ll be drawing much current through the mains.

3-phase electric supply

A 3-phase supply is useful for large businesses with high level electrical usage. A 3-phase supply allows for smaller, less expensive wiring and lower voltages, making it far safer and less expensive to run within a commercial environment.

The 3-phase supply is becoming increasingly popular for businesses with higher energy requirements, such as data centres. It’s highly efficient, with machinery and equipment specifically designed to run this type of supply.

With a 3-phase meter installation, you can measure the electrical consumption in Kilowatts per Hour (kWh). Typically, a 3-phase supply will have up to three meters or a single large meter. The meter has cables which are wired directly into it. Since 3-phase electric meters are more powerful than single-phase meters, they are ideally suited for large, commercial buildings.

Site visits and investigations

Before any work commences, our highly experienced electricity meter engineers will visit your site and begin a full site investigation, no matter where it is in the UK. It’s always our aim to cause as little disruption as possible to you and your team.

Our electricity meter engineers will complete their site investigation, ensuring that the highest quality standards are adhered to. Crown Energy can even help if you need to find a new contracted energy provider.

Ready to learn more about how we can help?

As well as 3-phase electric meter installations, we can also help with other gas or electricity meter services, such as:

With over 25 years’ experience as the energy and utility division of Crown Oil, our unrivaled customer service and fast project turnaround have resulted in many businesses coming back to us time and time again. We help everybody – from domestic customers through to businesses, the public sector, construction businesses and more.

Crown Energy Engineer with site plans

Why choose Crown Energy?

  • We make energy simple – reduced timescales and budget
  • UK based contact centre – we’re here to help
  • Specialist project management – an end-to-end service
  • Nationwide service – utility connections anywhere in the UK
  • Highly trained advisors and designers – free and professional advice
  • Competitive gas, water and electricity connection rates – fantastic value
  • Streamlined process – no more unnecessary paperwork, site disruption & legislative headaches
  • Dedicated account manager – one point of contact throughout

To find out more about how we can help you with your 3-phase electric meter installations, simply call our energy team today on 0330 123 2255.

7 reasons to choose Crown Energy
View
Unrivalled service from start to end
View
Our commitment to going green
View